A. Door to Door collection by Notified Service Provider / Agency-(1)Subject to provisions Clause 8of Bye-laws, Door to Door Collection shall be implemented by BBMP for all and/or certain categories of segregated Solid Waste, in all Wards of the BBMP from:
(a) doorsteps of households, shops, small commercial establishments and offices;
(b) entry gate or a designated location on the ground floor in a housing society, multi storied buildings or apartments, residential, commercial, institutional complexes or premises which do not fall within premises specified in Byelaw 6(1)(a) and are not Bulk Waste Generators;
(c) entry gate or specified places of slums and informal settlements.
(2)(a) BBMP through notified service providers would ensure segregated collection for each solid waste type, collect biodegradable(wet) waste and sanitary waste on a daily basis and non-biodegradable(dry) waste atleast twice or thrice a week as per necessity or as specified by BBMP from time to time. Dry waste collection could be carried out wherever possible through informal Waste pickers & Self Help Groups integrated into the BBMP’s dry waste collection system.
(b) However BBMP would also alternatively opt for daily collection of dry, wet and domestic hazardous waste either in separate suitable covered vehicles or in same covered vehicle with segregated compartments so that all three streams of waste could be collected in a segregated manner daily.
(3) In order to carry out Door to Door Collection as specified in clause 6(1), of byelaws, area-wise specific time slots including relevant day of the week for different categories of Solid Waste shall be notified by BBMP at the ward office and on the website of BBMP. In addition, route maps for collection including stops, starting and ending times and other relevant details shall be provided along with the time slots.
(4) BBMP shall for door to door collection from residential and Commercial waste generators, based on the prevailing normative standards as per Micro Plan blocks, assess the number of primary collection vehicles, Secondary Transportation Vehicles for each type of solid waste along with manpower and Pushcart (For slum house collection),that will be allotted to each Ward for efficient primary collection and transportation of segregated Solid Waste and to ensure that there is no inter-mixing of segregated Solid Waste. The ratio of number of manpower and vehicles with respect to the block shall be dependent on the number of nonbulk waste generators and shall be computed in accordance with the Micro Plan from time to time.
(5) BBMP shall specify at least one day in a week for Door to Door Collection of Horticulture & Garden Waste and shall collect the same through its Notified Service Provider, as part of its regular door to door collection system. Waste Generator shall handover their dry Bulky Waste such as Furniture and Furnishings such as wardrobes, tables, chairs, shoe racks, computer tables, beds, cots, chair, dining tables, sofas, etc., Kitchen utensils, Mattresses etc to the BBMP notified service provider as part of its regular door to door collection system.
(6) Notwithstanding the above, BBMP may extend the collection and transportation of waste to two or three times a day (day / evening / night collection) from all or certain waste generators along with specific times for collection from specific waste generators, subject to suitable additional user charges being collected regularly to cover such costs fully or partly.
B. Other collection by Notified Service Provider/Agency
(1) In addition to Door to Door Collection of Solid Waste under Clause 6 of Bye-laws, BBMP and/or Notified Service Provider as the case may be, shall collect Solid Waste from earmarked public spaces such as parks, markets, roads, streets, gardens, collection kiosks, Transfer stations and similar areas at specified times and days.
(2)Till such time Extended Producer Responsibility is implemented under the E-Waste (Management) Rules, 2016, BBMP would facilitate Collection or drop off of E-Waste, through E-waste Recyclers, on payment basis, if deemed necessary. BBMP may also notify DWCCs and any other drop off points for citizens to deposit their E-Waste from where the same would be picked by Ewaste Recyclers.
(3) For collection of Construction and Demolition Waste, the Waste Generator could contact BBMP or the Notified Service Provider, details of which shall be provided on its website and in its office. Upon payment of the relevant charges as notified by BBMP, the Notified Service Provider will collect the segregated Construction and Demolition Waste from the Waste Generator within a specified time period. This waste shall be transported to an authorised processing centre or any other designated location in accordance with C and D Rules, as notified by BBMP. The BBMP shall issue guidelines on management of Construction and Demolition Waste and this clause shall need to be read harmoniously with such guidelines.
C. Door to Door collection– Responsibilities of Notified Service Providers/ Agency and Waste Generators
(1) BBMP and/or Notified Service Providers shall announce their arrival for collection of Solid Waste by blowing a whistle and also play a recorded message / announcement through a loud speaker or by any other such means and at such time the Waste Generator must be ready to handover the segregated Solid Waste for collection. In the event the Waste Generator is not available to handover the Solid Waste, such Waste Generator must ensure that the Solid Waste is stored in a segregated manner at a prominently visible, convenient and accessible place for BBMP and/or Notified Service Provider to collect the Solid Waste. The segregated Solid Waste shall not be left in the open without an enclosure where they are susceptible to attacks by dogs, cows, pigs and other stray animals. Also, such waste shall not be kept stored in single use plastic bags and/or garbage bin liners which are banned.
(2) It shall be the duty of every Waste Generator to comply with regard to collection of the segregated Solid Waste by ensuring the same is segregated and deposited in correct Receptacles and is handed over in accordance with these Byelaw at the appointed time published by BBMP and/or Notified Service Provider. It shall be the responsibility of BBMP and / or designated person to monitor and report the Waste Generators that are not complying with the provisions of this Chapter. The non-compliant Waste Generators shall be penalised and fined in accordance with the provisions of Schedule VII of these Bye-laws.
(3) The collected segregated Solid Waste may be transported to Secondary Storage facilities such as waste storage/collection depots, Transfer Stations or material recovery facilitates or for respective processing at compost plants, bioenergy plants or any other site/plant designated by BBMP.
(4) There shall be no inter-mixing of segregated Solid Waste that has been collected from different Waste Generators during the transportation, transfer and processing of such waste. BBMP shall penalise the waste collector,transporterand its officials concerned if such mixing is found to have occurred.
(5) The Notified Service Provider vehicles would have to comply with GPS and RFID tagging of waste collection and transportation vehicles and its waste collectors / workers shall be on biometric attendance so that remote monitoring is enabled.