In these rules, unless the context otherwise requires.-
-
"Act" means the Karnataka Irrigation(Levy of Betterment Contribution and Water Rates) Act,1957;
-
"Assistant Commissioner" means the Assistant Commissioner in charge of the Revenue Sub-Division of the area in which the land in respect of which water rate leviable is situated;
(2-A) "Lift Irrigation Works" means an Irrigation work wherein water is lifted by mechanical contrivance from a natural stream or halla (1) Published in the Karnataka Gazette,6-1-1966,vide Notification No.PWD 33 LBW 64, dated 28-12-1965. (2) Clause(2-A) inserted by GSR 187,dated 30-6-1976 and shall be deemed to have come into force w.e.f.1-7-1976 or river or from a reservoir, pond, anicut and canal belonging to Government or Nigam] and used for irrigation purpose, and shall include all intake works, machinery and appurtenances required for the suction, delivery and distribution of water;] (2-B) “Nigam” means the Krishna Bhagya Jala Nigam Limited or the Karnataka Neeravari Nigam Limited [or the Cauvery Neeravari Nigam Limited or any other body or Corporation established by the State Government for this purpose] incorporated under the Companies Act, 1966 (Central Act of 1956)];
(3) “Revenue year” means the year commencing on the First day of July;
(4) “Section” means a section of the Act;
(5) “Tahsildar” means the Tahsildar entrusted with the land revenue administration of the taluk in which the land in respect of which water rate is leviable is situated.
4[3. Levy of Water Rates for the use of water from Irrigation works.-(1) In respect of water supplied, made available or used from any irrigation work] for growing the crops specified in column (2) of the Table below, except in the case of water supplied or made available to Water Users Societies] water rates at the rate specified in the corresponding entries in column (3) thereof shall, in respect of each such crop grown, be levied.
TABLE Flow Irrigation
| Sl no | Crops | Water rate in rupees per acre |
| 1 | Sugarcane | 400.00 |
| 2 | Paddy | 100.00 |
| 3 | Wheat, cotton, Groundnut and Sunflower | 60.00 |
| 4 | Jower, Maize, Navane, Ragi and Semi dry crops | 35.00 |
| 5 | Pulses | 35.00 |
| 6 | Tobacco | 35.00 |
| 7 | Garden Crops | 60.00 |
| 8 | Manurial Crops | 15.00 |
| 9 | Other Crops | 35.00 |
(3) Where water supplied or made available from any irrigation work cannot be used for irrigating any land without baling or using a mechanical contrivance and the water supplied or made available is used for irrigation after such bailing by using mechanical contrivance, water rates shall be levied at half the rates specified in sub-rule (1)].
(4) where water is supplied or made available or used for irrigation of land which had not been irrigated by water before coming into force of the Karnataka Irrigation (Levy of Water Rates)(Amendment)Rules, 2002.-
i. no water rate shall be levied during the first and second years after such commencement;
ii. water rates shall be levied at half the rate specified in sub – rule(1) during the third year after such commencement; and iii. water rates shall be levied in full as specified in sub- rule (1) for the fourth and subsequent years after such commencement:
- Sub-rules (1-A) and (2) omitted by Notification No. WRD 16 NPC 99(P), dated 9-10-2002 and shall be deemed to have come into force w.e.f 13-7-2000. 2. Substituted for the words, figures and brackets “specified in sub-rules (1) and (2)”by Notification No. WRD 16 NPC 99(P), dated 9-10-2002 and shall be deemed to have come into force w.e.f 13-7-2000. 3. Sub-rule (4) substituted by Notification No. WRD 16 NPC 99(P), dated 9-10-2002 and shall be deemed to have come into force w.e.f. 13-7-2000. Provided that nothing under this sub-rule shall be applicable in the case of water supplied or made available or used from lift irrigation work.] 1[3-A. Levy of water rate where no crop is grown. – Notwithstanding anything contained in Rule 3 where water is supplied made available or used for growing any crop or the irrigation of any land but no crop is actually grown, water rate shall be levied at the rates prescribed in the said rule as if the concerned crop was grown’.] 2[3-B. Levy of water rate for use of water from natural waterways, etc -(1) Where water is used from natural waterways, rivers and streams or parts thereof after obtaining permission for such use, for irrigation of any land ³[x x x x x], water rate at ten rupees] per acre shall be levied in respect of each revenue year.
(2) The provisions of Rule 4 applicable to the determination of water rate levied under Rule 3 shall mutatis mutandis apply to the determination of water rate payable under sub-rule(1).] 5[3-C. Levy of water rate for use of water from Lift Irrigation Works. – In respect of water supplied made available or used from any lift irrigation work owned and maintained by Government [or Nigam] for irrigation of any land, water rates shall be levied as below.-
| (1) | For sugarcane or Paddy crops. | Three times the rate as indicated in the table under Rule 3, Sub-rule (1) |
| (2) | For Crops other than Paddy and sugarcane. | Twice the rate as indicated in the table under Rule 3, sub-rule (1).] |
- Rule 3-A inserted by GSR 104, dated 2-4-1968 and shall be deemed to have come into force w.e.f 1-7-1965. 2. Rule 3-B inserted by GSR 165, dated 24-4-1969, w.e.f 15-5-1969 3. The words “after bailing or using a mechanical contrivance" omitted by GSR 27, dated 25-1-1973, w.e,f. 8-2-1973 4. Substituted for the words “ four rupees" by Notification No. WRD 16 NPC 99(P), dated 9-10-2002 and shall be deemed to have come into force w.e.f 13-7-2000. 5. Rule 3-C inserted by GSR 187,dated 30-6-1976 and shall be deemed to have come into force w.e.f. 1-7-1976 6. Inserted by notification No.WRD 16 NPC 99(P) dated 9-10-2002 and shall be deemed to have come into force w.e.f.13-7-2000 7. Rule 3-C inserted by GSR 11,Dated 1-1-1980 and shall be deemed to have come in to force w.e.f 1-3-1967 8. sub – rule (1) including provision substituted by notification No.WRD 16 NPC 99(P), dated 9-10-2002 and shall be deemed to have come into force w.e.f. 13-7-2000
Provided that where water used under clause(c) is returned unpolluted to such canal, tank, reservoir, anicut, bandhara, pond, kunta, talaparige or madagus the water rate for the quantity of water returned, shall be limited to fifty per cent of the rate payable under that clause:(a) if water is used for domestic purpose Rs. 375 per Meft (b) if water is drawn from natural water-ways, rivers or streams for industrial use Rs. 1,800 per Meft (c) if water is drawn from canal, Tank-Reservoir, Anicut and Bandhara, Pond, Kunta, Madagu Talaparige belonging to Government or Nigam for industrial use. Rs. 3,200 per Meft
Provided further that no water rate shall be levied under clause (b) or (c) for a period of two years from the date of starting of such industry and water rate shall be levied at half the water rate specified in clause (b) or (c) during the third year and full water rate as specified shall be levied from fourth year onwards].
(2) Necessary approved measuring device shall be installed by the person drawing water to measure the water drawn and returned.
(3) The Executive Engineer in charge of the irrigation work shall determined and recover the amount of water rate levied under sub-rule(1). The amount of water rate levied under subrule (1) shall be paid within fifteen days from the date of the demand notice, failing which supply of water may be stopped.
(4) Any person objecting to the levy of water rate as specified in the notice under subrule(3), may within thirty says from the date of service of such notice appeal to the Superintending Engineer who shall after giving the appellant an opportunity of being heard pass such orders as he thinks fit and the order of the Superintending Engineer on such appeal shall be final:
Provided that the Superintending Engineer may admit an appeal preferred after the period of thirty days if he is satisfied that the appellant had sufficient cause for not preferring the appeal within that period.]
(5) Where water is used from any irrigation work belonging to the Nigam reference to “Executive Engineer” and “Superintending Engineer” in sub rule(3) and (4) shall be constructed as reference to “Executive Engineer” and “Superintending Engineer” respectively of the Nigam.]